Enercon E66-E92 Owner’s Meeting - 21 Nov 2023

Enercon E66-E92 User Group

Our Enercon meetings have transformed. The composition of the operators we had at our Enercon meeting today looks as follows:

  • 40% - have cancelled the EPK contract and are self-performing their Enercon turbines
  • 60% - have an EPK contract in place with Enercon.

 

At today’s meeting, our members pitched the following challenges:

  • Power Cabinet Spares Shortage
  • Generator Maintenance
  • Tower Brush Retrofit
  • Stator winding failures
  • Fitting CMS to the main rotor bearings
  • Stator winding failures
  • Coating on generators degrading over time
  • Blade bearing bolt failures
  • Enercon stator windings short circuit: alternative repair ISP (other than OEM)
  • Main bearing failures: how to detect and prevent them?

 

The next Enercon E66-E92 Owner’s Meeting will be on the 20th of February. Learn more at this link.

 

Wish to include your company in these Enercon E66-E92 owner-to-owner discussions?

Pick a suitable time below and we can discuss how to include your company: